Files
redis-gui-foundation/plans/2026-03-30-frontend-verification-pass.md
Senior Frontend Engineer b6cbe5a47e docs(project): refresh baseline verification artifacts
Check in the PM product requirements, refreshed QA acceptance evidence, shared execution split plans, and current-phase status notes so the repo matches the current delivery baseline.

Co-Authored-By: Paperclip <noreply@paperclip.ing>
2026-03-31 10:15:39 +00:00

28 lines
1.3 KiB
Markdown

# Frontend Verification Pass
Date: 2026-03-30 UTC
Owner: Senior Frontend Engineer
Related issues: HAC-17, HAC-18, HAC-19
## Goal
Verify that the current desktop frontend state remains shippable for QA-facing Linux validation after the recent error-handling, structured-inspector, local-smoke-assist, icon, and packaging updates.
## Evidence Captured
1. Passed: `pnpm --filter @redis-gui/desktop test`
2. Passed: `pnpm run desktop:build`
3. Passed: `cargo test -p redis-core`
4. Passed: `pnpm run desktop:tauri:build`
## Verification Detail
- Frontend tests are 11 green across operator notices, structured inspector rendering helpers, and local smoke fixture helpers.
- The browser build completes successfully with the current desktop shell and utility-rail assist surfaces.
- The shared Rust backend core still passes 16 tests.
- The stable Linux packaging path still emits `.deb` and `.rpm` artifacts under `target/release/bundle/`.
## Current Conclusion
The current repository state is internally consistent for the documented stable Linux path: frontend tests, frontend build, backend tests, and standard `.deb`/`.rpm` packaging all succeed together. The remaining evidence gap is still GUI-capable smoke capture, not repository correctness on the validated build path.