Files
redis-gui-foundation/plans/2026-03-30-frontend-verification-pass.md
Senior Frontend Engineer b6cbe5a47e docs(project): refresh baseline verification artifacts
Check in the PM product requirements, refreshed QA acceptance evidence, shared execution split plans, and current-phase status notes so the repo matches the current delivery baseline.

Co-Authored-By: Paperclip <noreply@paperclip.ing>
2026-03-31 10:15:39 +00:00

1.3 KiB

Frontend Verification Pass

Date: 2026-03-30 UTC Owner: Senior Frontend Engineer Related issues: HAC-17, HAC-18, HAC-19

Goal

Verify that the current desktop frontend state remains shippable for QA-facing Linux validation after the recent error-handling, structured-inspector, local-smoke-assist, icon, and packaging updates.

Evidence Captured

  1. Passed: pnpm --filter @redis-gui/desktop test
  2. Passed: pnpm run desktop:build
  3. Passed: cargo test -p redis-core
  4. Passed: pnpm run desktop:tauri:build

Verification Detail

  • Frontend tests are 11 green across operator notices, structured inspector rendering helpers, and local smoke fixture helpers.
  • The browser build completes successfully with the current desktop shell and utility-rail assist surfaces.
  • The shared Rust backend core still passes 16 tests.
  • The stable Linux packaging path still emits .deb and .rpm artifacts under target/release/bundle/.

Current Conclusion

The current repository state is internally consistent for the documented stable Linux path: frontend tests, frontend build, backend tests, and standard .deb/.rpm packaging all succeed together. The remaining evidence gap is still GUI-capable smoke capture, not repository correctness on the validated build path.