Files
dbtool-cli-v1/plans/2026-03-26-pm-cto-handoff-refresh.md
Paperclip CTO d5f69462b0
Some checks failed
release-smoke / macos-13 / x86_64-apple-darwin (push) Has been cancelled
release-smoke / ubuntu-latest / x86_64-unknown-linux-gnu (push) Has been cancelled
release-smoke / windows-latest / x86_64-pc-windows-msvc (push) Has been cancelled
feat(usable): integrate current dbtool implementation snapshot
Co-Authored-By: Paperclip <noreply@paperclip.ing>
2026-04-02 08:26:18 +00:00

35 lines
941 B
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# 2026-03-26 PM CTO Handoff Refresh Plan
## Goal
基于当前仓库真实状态,形成一份可直接交给 CTO 的执行型需求说明,并同步 PM 记忆。
## Inputs
- `README.md`
- `PRODUCT_REQUIREMENTS.md`
- `DATABASE_SUPPORT_MATRIX.md`
- `apps/tui/README.md`
- `gui/desktop-foundation.md`
- `crates/db-app/src/lib.rs`
## Steps
1. 盘点当前 demo 已有能力与已落地边界
2. 固定目标用户、关键场景和主流程
3. 明确首版范围、非目标和验收标准
4. 说明 CLI -> shared app -> TUI -> GUI 的演进路径
5. 产出 CTO 交接文档并更新 PM 记忆
## Deliverables
- `CTO_REQUIREMENTS_HANDOFF.md`
- `$AGENT_HOME/memory/2026-03-26.md`
- `$AGENT_HOME/life/projects/dbtool-cli-v1/summary.md`
- `$AGENT_HOME/life/projects/dbtool-cli-v1/items.yaml`
## Status
- 状态completed
- 说明:当前阶段产品边界已经清晰,后续可由 CTO 继续按实现与发布维度拆解任务。